Wood River Swimming Pool hoping for late June opening

Recent healthy amounts of rain have not helped finalizing some aspects of the new swimming pool in Wood River. Wood River Mayor Greg Cramer noted that during one storm on May 28, the community received six inches of rain which has delayed paving of the parking lot which may happen later in the summer or later if needed. Mayor Cramer said that the pool is slated for inspection on Monday, June 11, and, barring any set backs with the inspection, the pool should open shortly after that. Some of the new pool’s features will include a splash pad with animated features, a 48” tube slide, a “lazy river,” a vortex, a water walk, a zero entry slide, and a zero entry water feature.

 

To read more please log in or subscribe to the digital edition https://etypeservices.com/Shelton%20ClipperID710/

The Shelton Clipper

P.O. Box 640
Shelton, NE 68876
1-308-647-5158